Fort Campbell, Kentucky – 4.7 MW Solar Farm

SCOPE: Design, Engineering, and Construction  VALUE: $5.9M SCHEDULE: October 2016-April 2017 BUSINESS: Renewables, Military & Energy The SOLR ENERGY team was selected to engineer and install a 4.7MW Solar PV farm at landfill number five on Fort Campbell’s US Army base in Kentucky.  The system generates 6,204,000 KWH per year of solar energy. That's 186 GWH [...]
Read more

USMC Tampa, FL – 82 KW PV System

SCOPE: Design, Engineering, and Construction  VALUE: $100K SCHEDULE: September 2017 - October 2017 BUSINESS: Renewables, Military, Energy, Solar PV  The SOLR ENERGY team was selected to diagnose and repair an 83KW PV System located on a Marine Corps center in Tampa Florida.  The system did not meet the Rapid shut down provisions of the Nation [...]
Read more

Marine Corps Center, Huntsville, AL – 124.8 KW PV

STATEMENT OF WORK Design, Engineering, and Construction  VALUE $120K SCHEDULE September 2017 - October 2017 BUSINESS Renewables, Military & Energy, Solar PV  The SOLR ENERGY team was selected to diagnose and repair an 124.8 KW PV System located on a Marine Corps Center in Huntsville, AL.  The system did not meet the Rapid shut down [...]
Read more

USNA Health Clinic, Annapolis, MD – 82KW PV

STATEMENT OF WORK Design, Engineering, and QC VALUE $216K SCHEDULE June 2016 - September 2017 BUSINESS Renewables, Military & Energy, Solar PV  The SOLR ENERGY team was selected to design, engineer and QC an 80KW Solar PV system for the United States Naval Academy Health Clinic in Annapolis, MD.  The system was engineered to be [...]
Read more